Page 1 of 1

California Radio Interoperable System (CRIS) - 9D2 - November 2025 Meeting

Posted: Tue Nov 18, 2025 1:48 pm
by Brian
California Radio Interoperable System (CRIS) - 9D2 -
November 2025 Update - Screenshots from the November 18,2025 meeting.
https://california-cris.blogspot.com/p/ ... pdate.html

CRIS-PSRSPC-Slide-Deck-November-2025.pdf
(2.69 MiB) Downloaded 19 times
_________________________________________________
Item 5: CRIS Design Concept:

Consistent with State Administrative Manual (SAM) Section 4530, PSC has developed and implemented CRIS to accommodate multiple state agencies.
• With CRIS the State has the ability to:
• Leverage purchasing power as a single entity
• Maximize the use of infrastructure
• Reduce redundant and duplicative networks

Purpose:
• Statewide P25 Phase II (TDMA) trunked radio system providing interoperable voice communications for public safety agencies.
• Designed to enhance interoperability among state, local, and federal partners during day-to-day operations and major incidents.

System Overview:
• Dual-core architecture for reliability and continuity
• Primary Core – Sacramento
• Backup Core – Los Angeles
• RF sites across California connected via the state microwave network with redundant backhaul paths

_________________________________________________
CRIS 47 Planned Sites:
Base Station name: - Group: - Band:
Antelope Mountain (AT&T) - Planned - VHF
BaldwinHill - Planned - 700MHz
Beckwourth Mtn. (CHP) - Planned - VHF
Big Hill (El Dorado) (CHP) - Planned - VHF
Black Metal - Planned - 700MHz
Black Mtn Hendrix - Planned - 700MHz
Black Mtn Imperial - Planned - 700MHz
Black Mtn. (Lassen) (CHP) - Planned - VHF
Bloomer Mtn. 700 - Planned - VHF
Boucher Mtn. L.O. CDF - Planned - 700MHz
Colby Mtn. (CHP) - Planned - VHF
Cold Springs (CDF) - Planned - VHF
Coleville Antelope Valley - Planned - VHF
Cottonwood (CHP) - Planned - VHF
East Bristol (CHP) - Planned - 700MHz
Flash II - Planned - 700MHz
Gold Run - Planned - 700MHz
Gunsight Peak (CHP) - Planned - VHF
Hamaker Mtn Siskiyou Co (CHP) - Planned - VHF
Hough Mtn (Plumas) (CHP) - Planned - VHF
Howell Mtn. - Planned - VHF
Iron Mtn - Planned - 700MHz
Klamath Alder Camp OES - Planned - VHF
LaHabra - Planned - 700MHz
Leek Spring - Planned - VHF
N.Sac A.O. - Planned - 700MHz
Oregon Peak - Planned - VHF
Pacheco Pass - Planned - 700MHz
Peavine Ridge MW (CHP-DCM) - Planned - VHF
Pise Mtn - Planned - 700MHz
Platte Mtn (Butte) (CHP) - Planned - VHF
Red Hill (Plumas) (CHP) - Planned - VHF
Relay Peak - Planned - 700MHz
Rocks Rd - Planned - 700MHz
Ruby Bluff (CHP) - Planned - VHF
San Miguel Mt. (CHP) - Planned - 700MHz
Scout Peak (DOT-Tower II) - Planned - VHF
Seaview (CHP) - Planned - VHF
Sierra College - Planned - 700MHz
Signal Peak - Planned - 700MHz
Slater Butte (CHP) - Planned - VHF
Smugglers Cave (CHP) - Planned - 700MHz
Soledad Mtn. (DC) - Planned - 700MHz
Thermoland - Planned - 700MHz
Union Hill (CHP) - Planned - VHF
Zion Mtn. (CDF) - Planned - VHF
Seigler Mtn. - Planned - VHF
_________________________________________________
image0.jpeg
image0.jpeg (305.02 KiB) Viewed 306 times
image1.jpeg
image1.jpeg (317.97 KiB) Viewed 306 times
image2.jpeg
image2.jpeg (288.5 KiB) Viewed 306 times
image3.jpeg
image3.jpeg (372.25 KiB) Viewed 306 times
image4.jpeg
image4.jpeg (324.63 KiB) Viewed 305 times
image5.jpeg
image5.jpeg (260.59 KiB) Viewed 305 times
image6.jpeg
image6.jpeg (321.93 KiB) Viewed 305 times
image7.jpeg
image7.jpeg (205.39 KiB) Viewed 305 times
image8.jpeg
image8.jpeg (382.2 KiB) Viewed 305 times
image9.jpeg
image9.jpeg (376.14 KiB) Viewed 305 times
image10.jpeg
image10.jpeg (302.24 KiB) Viewed 305 times
image11.jpeg
image11.jpeg (318.78 KiB) Viewed 305 times
image12.jpeg
image12.jpeg (291.06 KiB) Viewed 305 times
image13.jpeg
image13.jpeg (292.07 KiB) Viewed 305 times
image14.jpeg
image14.jpeg (156.06 KiB) Viewed 306 times

Re: California Radio Interoperable System (CRIS) - 9D2 - November 2025 Meeting

Posted: Tue Nov 18, 2025 6:07 pm
by mike
I see a waste of money and a huge money making grab for Motorola and a way those agencies will use it to take away transparency from we the people I would terminate that system if I had the power to if I was in a government role and focus on upgrading VHF High band analog conventional it works much better especially in more mountainous terrain.

Re: California Radio Interoperable System (CRIS) - 9D2 - November 2025 Meeting

Posted: Tue Dec 02, 2025 12:45 am
by Brian
Public Safety Radio Strategic Planning Comittee-20251118_095150
November 18, 2025
YouTube Video: https://www.youtube.com/watch?v=oNQwtHScoE8